Candace
Well-Known Member
Click for full size - Uploaded with plasq's Skitch
The last month was spent removing landscaping and a few trees. I worked hard over the 3 day weekend to get the stakes and backer boards set for stringing the foundation lines. It was so windy that I had to put off trenching. Hopefully I'll start that in the next week or two. I'll post periodic pics as I go along. Yes, I'm doing this on my own I hired out Greenhouse #1 but figured I'd give this one a go.
The red line is actually where the g.h. will be. The lines are for the 16" wide cement footing to carry the 2 ft. high, block knee wall.