D
Dane
Guest
Well after a little over a week and no progress (work pressure), I have found a few hours to continue. I have installed a couple of storage cupboards and shelves, moved in a bit of glass ware and equipment, electrics and lights are working, and there is a little soft background music.
![]()
Uploaded with ImageShack.us
As can be seen, this is the kitchen/prep room. I don't think my stainless table will fit here, so I will move this one into the growing room to use as a worktop. I still need to build the sink unit this week, so I will make an additional unit to replace the stainless table.
And a view from the prep room through to the growing room with the flasking room off to the left.
![]()
Uploaded with ImageShack.us
![]()
Uploaded with ImageShack.us
The growing room has four sets of racks now. I have nearly completed wiring the electrical control board for the lights and temperature control. I don't think this room is an urgency at the moment (as I don't have anything to put into it as of yet. I need to just make the 'dark cupboard' for germination with its narrow range temperature control, this will be done this week along with the sink unit.
And my laminar flow! Second hand, but appears to be in good working condition. I cant wait to try it out.
![]()
Uploaded with ImageShack.us
What remains is to move in the fridge, microwave, seating and white boards.
My reagents and culture media are due to arrive later in the week, then ..... just to wait for the first pods to ripen and I can get started!
Nice set-up!! :clap: Keep us up to date with your progress